Author Topic: White Rose Way  (Read 1791 times)

0 Members and 1 Guest are viewing this topic.

Dagenham Rover

  • VSC Member
  • Posts: 6842
White Rose Way
« on January 06, 2012, 06:28:27 pm by Dagenham Rover »
Just said on Radio Sheffield the new Bridge over the railway that was cancelled over xmas has been rescheduled, work to start tomorrow, so if you are coming that way allow a bit more time



(want to hide these ads? Join the VSC today!)

WheatleyRover

  • Forum Member
  • Posts: 889
Re: White Rose Way
« Reply #1 on January 06, 2012, 06:33:14 pm by WheatleyRover »
How can it be re scheduled? They only had them
 Few days to do it, it said in paper it will be done in november 2012 now

Spankster

  • Forum Member
  • Posts: 636
Re: White Rose Way
« Reply #2 on January 06, 2012, 06:42:46 pm by Spankster »
Gonna be murder after the game then :ohmy:

A9

  • Forum Member
  • Posts: 103
Re: White Rose Way
« Reply #3 on January 06, 2012, 06:43:57 pm by A9 »
Quote from: \"WheatleyRover\" post=209144
How can it be re scheduled? They only had them
 Few days to do it, it said in paper it will be done in november 2012 now


No, in the paper it said it would be \"completed\" by November 2012.
They have to put the big metal sections in. They only got 1 in on Christmas Day due to the wind.
No one has been on site working on it today, downed tools until they could carry on with the section over the railway line

Bit of a disaster all round for them. They must be having to pay compensation to Network Rail if they are closing the line again, they were told they only had Christmas Day due to no trains running.

Dagenham Rover

  • VSC Member
  • Posts: 6842
Re: White Rose Way
« Reply #4 on January 06, 2012, 06:47:05 pm by Dagenham Rover »
Only passing on what Radio Sheff said on the  6.00pm news

I take it that giant crane has become available

The Red Baron

  • VSC Member
  • Posts: 16137
Re: White Rose Way
« Reply #5 on January 06, 2012, 07:00:00 pm by The Red Baron »
Anyone know if the bridge will be closed? I come in that way off the M18.

dumbroofer

  • Forum Member
  • Posts: 584
Re: White Rose Way
« Reply #6 on January 06, 2012, 07:13:15 pm by dumbroofer »
i would think that they wont be able to shut the railway down untill after around 1am,so pointless closing the road untill late evening surely.
but what do i know? this is the building industry after all .

Padge_DRFC

  • Forum Member
  • Posts: 4947
Re: White Rose Way
« Reply #7 on January 06, 2012, 07:14:27 pm by Padge_DRFC »
Its only from 9pm a night until 8am. I work over there and was told

Muttley

  • VSC Member
  • Posts: 2285
Re: White Rose Way
« Reply #8 on January 06, 2012, 07:17:09 pm by Muttley »
Quote from: \"Dagenham.Rover\" post=209153
Only passing on what Radio Sheff said on the  6.00pm news

I take it that giant crane has become available


The big crane never left even though it was apparently booked for a job in Scotland.

dknward2

  • VSC Member
  • Posts: 7443
Re: White Rose Way
« Reply #9 on January 06, 2012, 08:01:56 pm by dknward2 »
Quote from: \"Muttley\" post=209179
Quote from: \"Dagenham.Rover\" post=209153
Only passing on what Radio Sheff said on the  6.00pm news

I take it that giant crane has become available


The big crane never left even though it was apparently booked for a job in Scotland.


amazing what money can do

i sure now this project will go massive over budget

pity that the road planners never listened to police advice when the road was first built saying it should be dual carriage way but typical cost-cutting has now cost more in the long run

knockers

  • Forum Member
  • Posts: 1746
Re: White Rose Way
« Reply #10 on January 06, 2012, 08:24:14 pm by knockers »
It will be closed at the following times:
9pm to 8 am sun
9pm mon to 8am tues
then
the next four saturdays closed at 8pm to sundays at 8am

 